1,215 patents currently held
5 more in force are now held by other companies
Held is read from USPTO's recorded assignments; a transfer never recorded there does not appear.
4 more records may belong here and await a decision; they are not counted.
The next term ends in Feb 2027. from the record
Free plan: 3 watched companies. Pro: unlimited.
Alerts on its grants, lapses and transfers.
107
Ending by 2030
Feb 2027
Next term end
1,154
Patent families
When these terms end
Held patents by the year their term ends
notable patents
fee due within 90 days
all others
Updated Nov 19, 2026 · includes USPTO assignment data published Nov 18, 2026, status data published Nov 19, 2026 and grant & fee data published Nov 17, 2026 (weekly) · how we know
Notable: the highest-ranked patents in this portfolio by citations and family size. Fee due within 90 days: a maintenance fee is due within 90 days of when this page was computed and not yet paid.
Notable patents
Ranked by citations and family size, against patents of the same kind granted the same year. How we rank
Notable
Ends Apr 2034 · High confidence
Also notable
Ends Feb 2030 · Medium confidence
Also notable
Ends Nov 2032 · High confidence
Also notable
Ends Nov 2031 · High confidence
Also notable
Ends Nov 2036 · High confidence
Also notable
Ends Feb 2035 · High confidence
Also notable
Ends Sep 2035 · High confidence
Also notable
Ends Nov 2028 · High confidence
Wind Turbine Blades
US 10,487,797
The most cited patent in this portfolio, cited by 57 later US patents, top 5% of utility patents granted in 2019 in our data. Protection runs to 2034.
Efficient Wind Turbine Blades, Wind Turbine Blade Structures, and Associated Systems and Methods of Manufacture, Assembly and Use
US 8,506,258
Cited by 28 later US patents, top 25% of utility patents granted in 2013 in our data, and renewed at 3 of 3 maintenance windows. Protection runs to 2030.
Nacelle for a Wind Turbine, the Nacelle Comprising Side Units
US 11,274,657
Cited by 7 later US patents, top 25% of utility patents granted in 2022 in our data. Protection runs to 2032.
Controlling a Wind Turbine to Stabilize an Electric Grid
US 8,946,916
Cited by 20 later US patents, top 25% of utility patents granted in 2015 in our data, and renewed at 3 of 3 maintenance windows. Protection runs to 2031.
Method for Forming a Wind Turbine Foundation and Related System for Forming Such a Foundation
US 11,236,727
Cited by 9 later US patents, top 25% of utility patents granted in 2022 in our data. Protection runs to 2036.
Method for Improving Large Array Wind Park Power Performance Through Active Wake Manipulation Reducing Shadow Effects
US 9,835,138
Cited by 21 later US patents, top 25% of utility patents granted in 2017 in our data, and renewed at every maintenance window due so far. Protection runs to 2035.
Control of a Wind Turbine with a Fault Condition
US 10,267,291
Cited by 12 later US patents, top 25% of utility patents granted in 2019 in our data, and renewed at 2 of 3 maintenance windows. Protection runs to 2035.
Structural Mat for Reinforcing a Wind Turbine Blade Structure, a Wind Turbine Blade and a Method for Manufacturing a Wind Turbine Blade
US 8,529,717
Renewed at every maintenance window since the 2013 grant; no more fees are due before its term ends in 2028.
Fee deadlines
Maintenance fees fall due 3.5, 7.5 and 11.5 years after grant. A missed fee ends a patent at the end of the six month grace period that follows, not on the due date.
- 5 fees due Nov 21 to 28, 2026 · next Nov 21
- 9 fees due Dec 6 to 25, 2026 · next Dec 6
- 13 fees due Jan 2 to 30, 2027 · next Jan 2
- 22 fees due Feb 1 to 28, 2027 · next Feb 1
- 25 fees due Mar 1 to 29, 2027 · next Mar 1
- 27 fees due Apr 1 to 24, 2027 · next Apr 1
- 15 fees due May 5 to 28, 2027 · next May 5
- 20 fees due Jun 1 to 30, 2027 · next Jun 1
- 22 fees due Jul 2 to 30, 2027 · next Jul 2
- 19 fees due Aug 2 to 27, 2027 · next Aug 2
- 27 fees due Sep 3 to 30, 2027 · next Sep 3
- 28 fees due Oct 2 to 30, 2027 · next Oct 2
- 11 fees due Nov 5 to 17, 2027 · next Nov 5
Recent changes
- Oct 22Assignment recorded on 1 record: Tillman, Alistair and 2 others to Vestas Wind Systems A/S Recorded Oct 22, 2026, executed Oct 10, 2026. Conveyance as recorded: Assignment of Assignor's Interest. A recorded assignment is a filed document, not a statement of current ownership. Reel 76464, frame 390.
- Oct 19Assignment recorded on 1 record: Botwright, Adrian and 1 other to Vestas Wind Systems A/S Recorded Oct 19, 2026, executed Oct 14, 2026. Conveyance as recorded: Assignment of Assignor's Interest. A recorded assignment is a filed document, not a statement of current ownership. Reel 76427, frame 708.
- 14 of the patents on this record were granted since Aug 21, 2026
- 19 terms have ended since Aug 21, 2026
What they patent
The largest of its 1,154 families, grouped by real patent family and labeled by the earliest filing in each. No technology classification is inferred from titles.
Patents held now
Soonest term end first.
Confidence:Highevery input resolvedMediumone input unresolvedLowtwo or more caveatsUSPTO recordfrom USPTO's bulk records, without the patent's file history
| Patent | Title | Status | Expires | Confidence |
|---|---|---|---|---|
| US 8,142,162 | Wind Turbine Blade In force · High confidence | In force | High confidence | |
| US 7,891,948 | Lightweight Composite Truss Wind Turbine Blade In force · Medium confidence | In force | Medium confidence | |
| US 7,891,949 | Lightweight Composite Truss Wind Turbine Blade In force · Medium confidence | In force | Medium confidence | |
| US 8,638,786 | Method of Controlling a Wind Turbine in a Wind Power Plant In force · Medium confidence | In force | Medium confidence | |
| US 8,109,061 | Tower Part for a Wind Turbine, an Aperture Cover System, a Method for Manufacturing a Tower Part and Uses Hereof In force · High confidence | In force | High confidence | |
| US 7,960,850 | Priority System for Communication in a System of at Least Two Distributed Wind Turbines In force · High confidence | In force | High confidence | |
| US 7,837,443 | Wind Turbine Comprising Enclosure Structure Formed as a Faraday Cage In force · High confidence | In force | High confidence | |
| US 7,841,143 | Tower Construction In force · High confidence | In force | High confidence | |
| US 8,393,993 | Wind Turbine Comprising at Least One Gearbox and an Epicyclic Gearbox In force · High confidence | In force | High confidence | |
| US 7,911,072 | Methods for Controlling a Wind Turbine Connected to the Utility Grid, Wind Turbine and Wind Park In force · High confidence | In force | High confidence |
Also on record, not counted in the 1,215: 5 patents in force now held by others · 399 patents ended · 233 applications pending · 227 applications abandoned. List them
Sources and methods
Compiled from USPTO application file histories, grants and recorded assignments, with the company's own names reviewed by hand. How this record was built
Portfolio grouped automatically from ownership conveyances to the names matched to this company, usually every name that begins with its own, so it counts patents an affiliate holds; each list row names the holder of record. Security interests are excluded and ambiguous records are not reviewed by hand.
Fee due within 90 days marks a patent with a maintenance fee due within 90 days of the date this page was computed and not yet recorded paid, so it can end earlier than the bar shows. A fee left unpaid ends the patent at the close of the six month grace period that follows its due date, not on the due date itself. It is not a prediction that the fee will be missed.
Computed patent terms end on the dates shown. Related patents and pending applications may cover overlapping subject matter.